{"id":16181,"date":"2022-03-05T04:16:09","date_gmt":"2022-03-05T09:16:09","guid":{"rendered":"https:\/\/evglobe.com\/?p=16181"},"modified":"2022-03-05T04:16:09","modified_gmt":"2022-03-05T09:16:09","slug":"vw-new-wolfsburg-factory-trinity-ev","status":"publish","type":"post","link":"https:\/\/evglobe.com\/2022\/03\/05\/vw-new-wolfsburg-factory-trinity-ev\/","title":{"rendered":"VW Investing $2.2 Billion To Build 2026 Trinity At New Wolfsburg Plant"},"content":{"rendered":"
Volkswagen\u2019s high-tech flagship has been teased several times already even though it won\u2019t go on sale until 2026. It wasn\u2019t even known where the EV would be built, until now as Wolfsburg has been chosen as the location. It won\u2019t be assembled at the existing factory, but rather at a new plant for which construction is scheduled to begin in 2023.<\/p>\n